Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

West Kisumu Improved Cook Stoves

GS-1288 ↗ · current registry ID: GS978

#295of 1329 in Industrial#32of 157 in Kenya#478of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
6.5
Claim Safety
4.0
Documentation
6.0

Audit Analysis

The West Kisumu Improved Cook Stoves project has a sound methodological foundation with a measured project-specific baseline and a combined additionality test, but suffers from a significant under-delivery of only ~14% of the pro-rata ex-ante expectation for the elapsed monitoring period. Multiple material findings (19 CARs/CLs) were raised and closed, and two corrective actions remain open. The absence of a stated buffer pool and the gap between assumed and verified usage rates introduce moderate integrity and claim-safety concerns.

Red Flags

  • Verified ERR of 14,841 tCO2e represents only ~14% of the pro-rata ex-ante expectation (~104,500 tCO2e) for the 5.1-year monitoring period out of a 7-year crediting period, indicating severe under-delivery or an overly optimistic ex-ante estimate
  • 19 material findings (CAR-01 to CAR-11, CL-01 to CL-08) were raised during verification, covering MR formatting, ex-ante parameters, KPT timing, fNRB review, calibration, GPS tracking, and usage survey frequency
  • Two corrective actions remain open: final decision on subsidized stove pricing and implementation of a warranty system for stove repairs

Credit Vintages

IssuedRetiredAvailable
2011
1,5581,52236
2012
2,7602,68377
2013
2,9092,85158
2014
3,2103,031179
2015
3,5253,45570
2016
87986217
Total14,84114,404437

Risk Indicators

Additionality

Combined test present; VVB confirmation not explicitly stated

Permanence

reversal risk unaddressed

Leakage

0% deduction deemed negligible; PDD did not address leakage

Baseline

Project-specific measured baseline; reassessed 2015

Safeguards

FPIC conducted, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents