Wind Energy Project By Ramco Group In India
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB using an investment test (validation/verification documentation in the extracted record).
missing Leakage is inconsistently handled and not quantified (monitoring reports show “deemed negligible” vs “not addressed,” and no leakage deduction is stated).
Transparency
verified Named independent VVB (Bureau Veritas Certification Holding SAS) and a clearly stated monitoring period (2011-04-01 to 2013-06-30).
missing ERR figures are inconsistent across reports/dates, reducing MRV transparency and traceability.
Claim Safety
verified Project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.
missing Over-crediting risk is elevated by contradictory claimed/verified ERR values and unclear leakage treatment.
Documentation
verified Good document coverage (9 documents used; includes monitoring, validation, and issuance) with high extraction confidence.
missing Numerous corrective action requests (CAR 3.2-1 through CAR 3.4-2) suggest documentation/control gaps that required remediation.
Detailed Analysis
Integrity
The project applies ACM0002 (version 10) with a project-specific baseline approach, and the extracted record indicates additionality was confirmed by the VVB via an investment test (validation/verification documentation). Leakage is a key weakness: one monitoring report (2011-05-09) deems leakage negligible, while a later monitoring report (2014-10-17) indicates leakage was not addressed, and no leakage deduction percentage is provided. No buffer pool contribution or reversal information is found in the extracted record; while wind is an avoidance project with low reversal risk, the absence of explicit statements still leaves an evidence gap. The presence of multiple corrective action requests suggests implementation/MRV issues that can affect integrity if not fully resolved.
Transparency
The monitoring period is clearly stated (2011-04-01 to 2013-06-30) and the VVB is identified as Bureau Veritas Certification Holding SAS, which supports audit traceability. However, the extracted record shows substantial inconsistencies in emissions reduction figures across documents and dates, making it difficult to reconcile what was claimed versus what was ultimately verified. Leakage treatment is also inconsistent across monitoring reports, further reducing clarity on accounting choices. Overall transparency is moderate due to these internal inconsistencies despite decent document coverage.
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of aviation-related double-claiming channels. CCP status is not found in the extracted record, leaving uncertainty for high-integrity label claims. Over-crediting/greenwashing risk is elevated because key ERR numbers conflict across validation/verification documents and leakage is not consistently justified or quantified. The baseline is project-specific and the timing of any baseline reassessment is not stated, which adds uncertainty for long crediting periods.
Documentation
The extracted record indicates 9 documents were used and includes monitoring, validation, issuance, and an additional unknown document type; extraction confidence is high, which supports completeness. The most recent document date shown is 2014-10-17 (monitoring report), and the monitoring period sits within the 2006-2016 crediting period, which is plausible. However, seven corrective action requests are listed, indicating that documentation and/or controls required significant follow-up. Several important fields (buffer pool, leakage deduction percentage, baseline reassessment timing, safeguards) are not evidenced in the extracted record, limiting documentation strength.
Overall
Overall quality is constrained by reliability issues in core accounting figures and inconsistent leakage treatment. For the contradictions: (1) total claimed ERR differs between two validation reports (590,912 in the 2011-05-12 validation report vs 740,105 in the 2012-09-06 validation report); I privilege the later 2012 value as more recent, but the inconsistency still reduces confidence. (2) leakage is “deemed negligible” in the 2011-05-09 monitoring report but “not addressed” in the 2014-10-17 monitoring report; I privilege the later 2014 statement as it is more recent and more conservative, and this lowers integrity/claim-safety. (3) total verified ERR conflicts (740,105 in the 2012-09-06 report vs 661,206 in the 2015-02-26 report); I privilege the later 2015 figure as more recent, but the contradiction indicates weak traceability and drives a downward adjustment to transparency and claim safety. Note: gate rules may cap the overall score if integrity were below 4.0 or transparency if documentation were below 3.0; neither applies based on these scores.
Audit Analysis
This is a VCS wind power project using ACM0002 with additionality confirmed by the VVB, which supports baseline and additionality credibility. However, leakage treatment is inconsistent across monitoring reports and key emissions reduction figures conflict across documents, increasing over-crediting and reliability concerns. Social safeguards (FPIC, grievance mechanism, benefit sharing) are not evidenced in the extracted record.
Project Description
This wind power project in Tamil Nadu and Karnataka consists of 136 Wind Turbine Generators (WTGs) that generate 159.75 MW of electricity, which is considered carbon neutral. The project would produce around 324 GWh of electricity annually, replacing power at the Tamil Nadu Electricity Board (TNEB), Bangalore Electricity Supply Company Ltd (BESCOM) and Chamundeshwari Electricity Supply Corporation Ltd (CESC). The project's goal is to generate electricity from wind power.
Red Flags
- Conflicting emissions reduction numbers across documents (claimed and verified figures vary by report/date), undermining confidence in credited volumes.
- Leakage is alternately described as “deemed negligible” and “not addressed,” with no quantified leakage deduction stated.
- Multiple corrective action requests (seven CARs) indicate MRV/control weaknesses during verification/assessment.
- No evidence found for FPIC, grievance mechanism, or benefit-sharing arrangements.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 106,845 | 21,157 | 85,688 | |
| 2007 | 193,037 | 41,681 | 151,356 | |
| 2008 | 309,581 | 190,350 | 119,231 | |
| 2009 | 356,335 | 356,335 | 0 | |
| 2010 | 320,210 | 320,210 | 0 | |
| 2011 | 308,664 | 308,664 | 0 | |
| 2012 | 319,205 | 319,205 | 0 | |
| 2013 | 78,346 | 77,556 | 790 | |
| Total | 1,992,223 | 1,635,158 | 357,065 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled ERR table linking each document (validation/verification/issuance) to final claimed vs verified totals, explaining any revisions across 2011/2012/2015 figures.
- Provide explicit leakage assessment under ACM0002 for the monitored period, including a clear justification and a stated leakage deduction (even if 0%) consistent across monitoring reports.
- Disclose safeguards evidence (FPIC process, grievance mechanism, and benefit-sharing/community engagement) in project documentation or monitoring reports.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project but reversal/buffer not evidenced
Inconsistent treatment; no quantified deduction
Project-specific baseline; reassessment timing unclear
No FPIC/grievance/benefit-sharing evidenced
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →