Vai al contenuto principale
GS Wind Viet Nam Documentazione completa General Methodology v2.0

Wind Power Project At Sea – No.5 Wind Power Plant Thanh Hai 1-4

GS-2755 ↗

4.4 / 10
Integrity
4.8
Transparency
4.2
Claim Safety
4.1
Documentation
4.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the validation report used a common-practice test.

missing Leakage is not addressed in the verification report, reversal events are not addressed, and no buffer pool is stated.

Transparency

verified The project has a named VVB, a defined monitoring period, and a verification report with several clarification requests and corrective actions closed.

missing Total ERR claimed and verified are not stated, and key MRV details such as grid emission factor and usage monitoring method are missing.

Claim Safety

verified The project is under Gold Standard and uses ACM0002 for a wind project, which is generally a standardised renewable methodology.

missing Leakage treatment is inconsistent across documents, and no CORSIA or CCP status is stated, leaving dual-claim risk unresolved.

Documentation

verified Multiple official documents were available, including validation, verification, monitoring, and PDD records.

missing Extraction confidence is low, and several important fields are missing or only partially documented.

Detailed Analysis

Integrity

The verification report confirms additionality was checked by the VVB, while the validation report indicates a common-practice test rather than the investment test described in the PDD. I privileged the validation report for the additionality test type because it is the later and more specific assessment of project eligibility, but the inconsistency still weakens confidence. Leakage is marked as not addressed in the verification report, and reversal risk is also not addressed, with no buffer pool percentage found in the extracted record.

Transparency

The project has a named verifier, China Classification Society Certification Co., Ltd., and the monitoring period is clearly stated. However, total ERR claimed and verified are not found in the extracted record, and important MRV details such as the grid emission factor, usage monitoring method, and FNRB method are missing. The verification report also notes three clarification requests and one corrective action request, which were closed, but the low extraction confidence reduces documentation clarity.

Claim Safety

Claim safety is weakened by the inconsistent leakage treatment: the monitoring report said leakage was deemed negligible, but the verification report later says leakage is not addressed. I privileged the verification report because it is the more recent assurance document, but the contradiction raises over-crediting risk. No CORSIA eligibility or CCP status is stated, so dual-claim exposure cannot be ruled out from the available record.

Documentation

The record includes several official documents, which is a positive sign, and the verification report shows that multiple clarification requests and a corrective action request were closed. Still, the extraction confidence is low, and several key fields are missing, including verified emissions totals, buffer pool coverage, and baseline reassessment timing. The crediting period also differs between the PDD and verification report, which further reduces documentation reliability.

Overall

The project has some credible elements, especially VVB-confirmed additionality and documented safeguards such as FPIC, grievance handling, and benefit sharing. But the evidence base is weakened by low extraction confidence, missing MRV data, and contradictions on leakage, additionality test type, benefit sharing, and crediting period. I privileged the later verification and validation documents over the older PDD where they conflict, because they are more recent and closer to issuance, but the contradictions still warrant a downward adjustment in confidence and score.

Audit Analysis

This wind project has some positive integrity signals, including VVB-confirmed additionality and a grievance mechanism with FPIC and benefit-sharing described. However, key risk controls are weak or unclear: leakage is not addressed in the verification report, reversal risk is not addressed, and several important fields are missing or inconsistently reported across documents. Overall confidence is limited by low extraction confidence and multiple contradictions between the validation, PDD, monitoring, and verification records.

Project Description

Developer: South Pole Ltd SCV Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2021-10-29 → 2026-10-28 Estimated annual credits: 319920 tCO2e SDGs: Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy

Red Flags

  • Leakage is marked as not addressed in the verification report, despite an earlier monitoring report saying it was negligible.
  • Reversal risk is not addressed and no buffer pool percentage is stated.
  • Several core data points are missing, including total ERR claimed and verified, grid emission factor, and usage monitoring details.
  • The record contains contradictions on additionality test type, benefit sharing, and crediting period.

Credit Vintages

Issued Retired Available
2021
11,407 11,407 0
2022
64,128 50,979 13,149
2023
79,062 0 79,062
2024
60,147 0 60,147
2025
4,770 0 4,770
Total 219,514 62,386 157,128

Cosa migliorerebbe questo punteggio

  • Publish a complete monitoring and verification package with total ERR claimed and verified, grid emission factor, usage monitoring method, and baseline reassessment details.
  • Resolve the contradictions on leakage, additionality test type, benefit sharing, and crediting period, and state CORSIA eligibility and CCP status explicitly.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

reversal risk not addressed

Leakage

inconsistent leakage treatment

Baseline

project baseline, reassessment missing

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-17 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti