Wind Power Project In Gujarat
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB (validation/verification documentation referenced in the extracted record).
missing Baseline is project-specific and the timing of any baseline reassessment is not stated in available documents; MRV weaknesses are indicated by numerous corrective actions in the monitoring report (2022).
Transparency
verified Key project attributes are identifiable (VCS registry, methodology ACM0002 v12.3.0, VVB named, monitoring period stated in the monitoring report dated 2022-07-19).
missing Reported ER figures and some safeguard statements vary materially across documents, reducing traceability and confidence in the public record.
Claim Safety
verified The project is explicitly not CORSIA-eligible in the extracted record, reducing some downstream claim-risk exposure.
missing Contradictory ER quantities across validation/monitoring documents and unresolved double-counting evidence requests elevate over-crediting/greenwashing risk.
Documentation
verified A relatively large document set was used (24 documents including PDD, monitoring reports, validation report, issuance) with high extraction confidence.
missing Numerous corrective actions requested (including double-counting declarations and monitoring parameter evidence) indicate documentation quality/control issues in the monitoring report (2022).
Detailed Analysis
Integrity
The project applies ACM0002 with a project-specific baseline approach, and additionality is confirmed by the VVB per the extracted validation/verification record. However, the baseline reassessment timing is not stated in available documents, and the monitoring report (2022-07-19) lists many corrective actions (e.g., missing event logs impacting ERs, incomplete monitoring sections, and calibration frequency non-compliance), which weakens confidence in the robustness of quantified reductions. Leakage is treated as negligible with a 0% deduction in the 2022 monitoring report, but earlier monitoring (2020-10-07) reportedly did not address leakage, creating uncertainty about consistent application over time.
Transparency
Core MRV metadata is present (VVB identified as LGAI Technological Center/Applus+, monitoring period 2021-06-01 to 2021-08-05, and grid emission factor 0.9528 in the extracted record). Transparency is reduced by material inconsistencies across documents in both claimed and verified ER totals, and by multiple template/recordkeeping corrections requested in the monitoring report (2022-07-19). The presence of repeated requests for supporting documents (JMRs/invoices, commissioning certificates, calibration certificates, and internal audit procedures) suggests the public-facing record may not be consistently complete or easily auditable.
Claim Safety
The project is marked as not CORSIA-eligible in the extracted record, which lowers the risk of certain high-stakes aviation claims. Nonetheless, over-crediting/claim risk is elevated because ER quantities differ substantially across documents (including differences between validation/monitoring figures), and the monitoring report (2022-07-19) includes requests for declarations and evidence to avoid double counting (including participation in other GHG programs and REC/CER considerations). CCP status is not stated in available documents, leaving uncertainty for CCP-aligned claims.
Documentation
Documentation coverage is moderate-to-good in breadth (24 documents used; evidence includes PDD, monitoring report, validation report, and issuance) and extraction confidence is high. Quality is weakened by the extensive list of corrective actions in the monitoring report (2022-07-19), including missing implementation/shutdown details, missing information on events affecting ERs, incomplete organizational/QA descriptions, and calibration compliance issues. These indicate that while documents exist, they may require significant remediation to be fully decision-grade.
Overall
Overall scoring is pulled down primarily by contradictions and corrective-action volume that undermine confidence in ER quantification and consistent application of requirements. For the ER contradictions, I privilege the more recent figures where possible (e.g., the 2022 validation/verification figure of 11,867 verified ERs over the 2021 figure of 44,356, and the 2020 validation figure of 84,173 claimed ERs over the 2018 monitoring figure of 211,372) because later documents typically reflect updated checks and corrections; however, the magnitude of the discrepancies still signals reliability risk and reduces integrity/transparency/claim-safety scores. For leakage and safeguards contradictions, I treat the latest monitoring report (2022-07-19) as the best available statement (leakage deemed negligible; safeguards/grievance/benefit-sharing/FPIC present) but apply a penalty because earlier monitoring (2014 and 2020) indicates these were absent or not addressed, suggesting inconsistent disclosure over time. The crediting period contradiction is also resolved in favor of the latest monitoring report (2011-08-06 to 2021-08-05) as the most recent operational framing, but the inconsistency with the older validation report indicates record-control weaknesses.
Audit Analysis
The project is a grid-connected wind power activity under ACM0002 with additionality confirmed by the VVB, but several internal inconsistencies across reports weaken confidence in the quantified results. Leakage is treated as negligible with a 0% deduction in the latest monitoring, yet earlier monitoring did not address leakage, and multiple corrective actions indicate MRV and recordkeeping weaknesses.
Project Description
MEIL, formerly Caparo Energy (India) Limited, has established a 25.20 MW wind power project in the Rajkot and Surendranagar districts of Gujarat State. The project features 12 Wind Electric Generators (WEGs) from Suzlon Energy Limited’s (SEL) S88 model, each with a capacity of 2.1 MW, as part of their foray into the renewable energy sector in India.
Red Flags
- Large discrepancies across documents for claimed and verified emission reductions (e.g., claimed 84,173 vs 211,372; verified 11,867 vs 44,356), increasing over-crediting and reliability risk
- Extensive corrective actions in the monitoring/verification cycle (e.g., missing implementation/shutdown details, missing event logs affecting ERs, calibration non-compliance, incomplete monitoring report sections, and double-counting declarations requested)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 10,429 | 10,429 | 0 | |
| 2012 | 56,066 | 56,066 | 0 | |
| 2014 | 49,595 | 49,595 | 0 | |
| 2015 | 51,626 | 51,626 | 0 | |
| 2016 | 48,746 | 48,746 | 0 | |
| 2017 | 46,287 | 46,287 | 0 | |
| 2018 | 42,255 | 42,255 | 0 | |
| 2019 | 45,892 | 45,892 | 0 | |
| 2020 | 40,208 | 11,144 | 29,064 | |
| 2021 | 27,159 | 0 | 27,159 | |
| Total | 418,263 | 362,040 | 56,223 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation table across all monitoring/verification/issuance documents explaining differences in claimed vs verified ERs (by period, data source, and any corrections).
- Provide complete, auditable evidence packs for monitoring parameters (including calibration certificates meeting the registered frequency, event logs affecting generation/ERs, internal audit procedures, and explicit double-counting/REC/CER declarations) and ensure consistent safeguards/grievance/FPIC documentation across reporting periods.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment additionality
Avoidance project; no reversal mechanism needed
0% leakage but inconsistently addressed across periods
Project-specific baseline; reassessment timing unclear
Safeguards reported recently but inconsistent historically
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →