VCS avoidance India Vintage 2016 Registry: Registered Documentazione completa General Methodology v2.0

Wind Power Project In Rajasthan

VCS-1195 ↗

5.7 / 10
Integrity
6.2
Transparency
5.4
Claim Safety
5.8
Documentation
4.6

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB using an investment test (validation/verification record).

missing Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record; leakage treatment is inconsistent across monitoring reports.

Transparency

verified Claimed and verified ERs match for the latest issuance figure (issuance record shows 60,570 and the extracted verified total is 60,570).

missing Monitoring evidence quality appears weak: the 2022 monitoring report requests many missing supporting documents and corrections, reducing MRV transparency.

Claim Safety

verified Not CORSIA-eligible (registry eligibility flag), reducing aviation-claim channel risk.

missing Contradictory ER totals and crediting-period dates across documents elevate over-crediting and misrepresentation risk.

Documentation

verified A relatively large document set was available (24 documents including PDD, monitoring reports, validation report, and issuance) with high extraction confidence.

missing The 2022 monitoring report records extensive corrective actions for missing key documents and monitoring evidence, indicating documentation gaps at verification time.

Detailed Analysis

Integrity

The project applies ACM0002 (version 12.3.0) with a project-specific baseline approach and a stated grid emission factor (0.9529) referenced to a 2012 grid EF year (monitoring record). Additionality is reported as an investment test and is confirmed by the VVB (validation/verification record). Leakage is treated as a 0% deduction with leakage deemed negligible in the 2022 monitoring report, but an earlier 2020 monitoring report indicates leakage was not addressed, which weakens confidence in consistent application of the methodology. As an avoidance (renewable electricity) project, reversal risk is inherently low, but no buffer pool information is provided in the extracted record.

Transparency

The extracted record shows the same total ERs claimed and verified (60,570), and an issuance record also lists 60,570, which supports internal consistency for the latest issuance figure. However, the 2022 monitoring report lists numerous corrective actions requesting core evidence (PPAs, commissioning certificates, calibration certificates, invoices/JMR, feeder-wise turbine details, and monitoring practice descriptions) and notes alteration of the VCS monitoring report template, which undermines MRV transparency. The monitoring period shown is very short (2021-06-01 to 2021-06-18), and the extracted record does not provide further detail on how monitoring completeness was ensured beyond the corrective-action list.

Claim Safety

The project is explicitly not CORSIA-eligible, which reduces the risk of high-impact aviation claims (registry eligibility flag). Nevertheless, there is a major inconsistency in ER quantities across documents: one validation report version cites 13,086 while later validation/issuance information cites 60,570, creating a material over-crediting/communication risk if stakeholders rely on the wrong figure. Leakage claims also vary between monitoring reports (not addressed in 2020 vs deemed negligible with 0% deduction in 2022), which can affect confidence in conservative accounting even if leakage is typically low for grid-connected wind. CCP status is not stated in the extracted record, leaving uncertainty about alignment with higher-integrity claim frameworks.

Documentation

The evidence set is reasonably broad (PDD, monitoring report(s), validation report, issuance; 24 documents used) and extraction confidence is high, suggesting the corpus was readable. Despite that, the 2022 monitoring report documents extensive missing attachments and requested declarations (including no-double-counting undertakings and participation in other GHG programs), plus missing calibration certificates and commercial/operational records (JMR/invoices), indicating documentation weaknesses at the time of assessment. These gaps reduce confidence that the monitoring report package, as submitted, was complete and audit-ready.

Overall

Overall scoring is pulled down primarily by contradictions and audit-readiness issues. For ER totals, the issuance record dated 2021-10-26 (60,570) is privileged over the older validation report dated 2020-10-30 (13,086) because issuance is the authoritative registry outcome for verified units; however, the existence of both figures is a significant reliability red flag. For leakage, the more recent 2022 monitoring report’s 'deemed negligible' treatment is privileged over the 2020 monitoring report’s 'not addressed' statement due to recency, but the inconsistency still reduces confidence. For safeguards/grievance/FPIC, later monitoring reports (2020–2022) indicating these elements are privileged over the 2013 monitoring report indicating absence, but the shift suggests either evolving practice or inconsistent disclosure; this uncertainty lowers transparency and claim-safety scores. For the crediting period, the 2022 monitoring report’s specific dates (2011-06-19 to 2021-06-18) are privileged over the 2012 validation report’s incomplete/unclear period, but the discrepancy indicates recordkeeping inconsistency.

Audit Analysis

This VCS wind project uses a standard grid-connected renewable methodology (ACM0002) and reports verified issuance matching the claimed reductions for the latest period. However, extensive corrective actions in the 2022 monitoring report and multiple cross-document inconsistencies (ERR totals, crediting period, and safeguards/leakage statements) reduce confidence in MRV reliability and increase over-crediting/greenwashing risk.

Project Description

MEIL has installed a 42MW wind power project in Jaisalmer District, Rajasthan, India. The project consists of 20 Wind Electric Generators with a capacity of 2.1 MW each. The project generates zero emissions and uses Suzlon Energy Limited's S88 model WEGs, which are known for their advanced technical design and strong R&D support.

Red Flags

  • Large discrepancy in reported/verified ERs across documents (60,570 vs 13,086) indicates data reliability issues.
  • 2022 monitoring report lists numerous missing core evidences (PPAs, commissioning certificates, calibration certificates, invoices/JMR, feeder-wise turbine details) and even alteration of the VCS MR template.
  • Safeguards and grievance/FPIC statements are inconsistent across monitoring reports (present in later reports but absent in 2013).
  • Leakage treatment is inconsistent across monitoring reports (not addressed in 2020 vs deemed negligible with 0% deduction in 2022).

Credit Vintages

Issued Retired Available
2011
21,074 21,074 0
2012
70,044 70,044 0
2014
61,837 61,837 0
2015
66,885 66,885 0
2016
53,924 53,924 0
2017
54,188 54,188 0
2018
54,927 54,927 0
2019
54,326 54,326 0
2020
51,010 10,074 40,936
2021
25,908 0 25,908
Total 514,123 447,279 66,844

Cosa migliorerebbe questo punteggio

  • Publish a clean, consistent ER and crediting-period narrative across the PDD/validation/monitoring/issuance documents, explicitly reconciling the 13,086 vs 60,570 figures and clarifying which periods each figure covers.
  • Provide complete monitoring evidence packages (PPAs, commissioning certificates, feeder-wise turbine list, JMR/invoices, calibration certificates/meter replacement records) and remove any non-standard alterations to the VCS monitoring report template, with a clear VVB closure of all corrective actions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversals reported

Leakage

0% deduction but inconsistent treatment across reports

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards/grievance/FPIC inconsistently documented over time

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.