Analysis pending
Wind Power Project in Thatta, Sindh by Triconboston
Assessment
Analysis queued
This project is in the analysis queue and has not been rated yet. Registry data, credit vintages and purchase availability below reflect the latest registry snapshot; the quality score will appear here once the analysis completes.
Standard and methodology
- Standard
- Global Carbon Council (GCC)
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Pilot phase only (2021–2023)
Eligible only for the pilot phase: not usable for the current 2024–2026 phase.
Source: registry label · read on 1 Nov 2026
Covers: credits of this project that carry the label on the registry — not every unit or lot
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Recent label changes on the registry
- added: CORSIA – Pilot Phase, 2021-2023 Eligible
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
Issuance data not yet available — check back soon.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Inner Mongolia Jianli Zhaosheng Wulatezhongqi 40MW Solar Power ProjectGCC-205
- 300 MW Nokhra Solar PV ProjectGCC-933
- LIG - QUANG TRI SOLAR POWER PROJECTGCC-143
- 60 MW Wind Power ProjectGCC-480
- Karakurt HEPPGCC-721
- Wind project by Juniper Green Beam Private Limited in GujaratGCC-1096
- Wind Energy Project in Kutch, Gujarat-2GCC-1152
- 200MW Solar Project in GujaratGCC-521
