WUHE BIOGAS RECOVERY AND UTILIZATION PROJECT
#104of 268 in Biogas#654of 1084 in China#756of 1339 in Verra (VCS)#37of 66 in ACM0010
Audit Analysis
The Wuhe Biogas project has VVB-confirmed additionality via an investment test and a registered status under VCS, but is undermined by six material findings—including a 25% discrepancy in animal head counts that directly affects the baseline—and the absence of FPIC. The project-specific, modeled baseline and lack of buffer pool data introduce moderate permanence and baseline risk. Conservative revisions to the grid emission factor and ERR between PDD versions are positive, but the overall documentation quality is weakened by low extraction confidence and multiple corrective actions.
Red Flags
- 25% discrepancy in animal head counts (36,000 in FSR vs 45,000 actual) directly undermines baseline reliability
- FPIC was not conducted despite the project's community-facing nature in China
- No buffer pool percentage or reversal event data found in any available document, leaving permanence risk unquantified
- Six material findings and six corrective actions required in the verification report indicate significant documentation and data-quality gaps
- Low extraction confidence across the document set reduces reliability of the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Stated as quantified but no pct found
Project-specific, modeled, no reassessment date
Grievance present but FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →