WWF Biogas Nepal II
GS-730 ↗ · current registry ID: GS4265
#15of 268 in Biogas#9of 101 in Nepal#207of 1801 in Gold Standard (GS)
Audit Analysis
WWF Biogas Nepal II is a Gold Standard biogas project with a confirmed barrier-based additionality test and a quantified 5% leakage deduction, but it relies on a project-specific baseline and lacks a stated buffer pool. The project over-delivers relative to its ex-ante estimate (approximately 220% of the pro-rata expectation for the monitoring period), which is a positive signal for claim safety. Multiple contradictions across documents—particularly in the ex-ante lifetime ERR, additionality verification status, and crediting period dates—introduce moderate data-reliability concerns.
Red Flags
- Additionality was marked as not verified in the 2022 verification report but confirmed in the 2025 report; the earlier negative finding is unexplained in the extracted record.
- The ex-ante lifetime ERR differs by a factor of ~3.6 between the 2014 appendix (691,591 tCO₂e) and the 2025 monitoring report (193,565 tCO₂e), with no documented reconciliation.
- Crediting period dates differ between the 2022 and 2025 verification reports (2017-07-24 to 2024-07-23 vs 2017-04-30 to 2023-03-31), suggesting a possible period correction or extension that is not clearly documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 441 | 0 | 441 | |
| 2018 | 80,563 | 68,506 | 12,057 | |
| 2019 | 80,563 | 70,012 | 10,551 | |
| 2020 | 78,669 | 73,572 | 5,097 | |
| 2021 | 74,108 | 20,696 | 53,412 | |
| 2022 | 35,649 | 0 | 35,649 | |
| Total | 349,993 | 232,786 | 117,207 |
Risk Indicators
VVB-confirmed barrier test (2025)
no reversal events reported
5% quantified deduction applied
Project-specific; no reassessment date stated
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →