Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Lao Registry: RegisteredAMS-I.D

XESET 2 EXTENTION HYDROPOWER PROJECT

VCS-3353 ↗

#1336of 1935 in Renewable energy#7of 10 in Lao#933of 1339 in Verra (VCS)#428of 806 in AMS-I.D

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The Xeset 2 Extension Hydropower Project is a VCS-registered renewable energy project in Lao PDR with a jurisdictional baseline and VVB-verified investment additionality test. However, the validation report records 24 material findings and 10 corrective actions—many concerning investment-analysis inconsistencies—and no monitoring data, buffer pool, or verified emission reductions are available. The project's claim safety is moderate but untested in the field, and documentation quality is weakened by low extraction confidence and inter-document contradictions.

Red Flags

  • 24 material findings in the validation report, including inconsistencies in the investment analysis (benchmark rate, IRR, depreciation, fair value, royalty timing) that required corrective action before validation could be issued
  • No buffer pool percentage stated and no permanence claim period specified, leaving reversal risk unquantified for a 7-year crediting period
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, and a contradiction exists between the validation report (deemed negligible) and an appendix (quantified)
  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's location in Lao PDR and its impact on local communities
  • Grid emission factor is from 2010, which may not reflect current Lao PDR grid conditions, potentially affecting the magnitude of claimed reductions

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified but 24 material findings on investment analysis

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only, contradictory justification

Baseline

Jurisdictional baseline, grid EF from official Lao PDR data

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.