Vai al contenuto principale
VCS avoidance China Registry: Late to verify Documentazione completa General Methodology v2.0

Xiaoxi Hydropower Project

VCS-670 ↗

6.5 / 10
Integrity
6.2
Transparency
6.8
Claim Safety
6.0
Documentation
7.2

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Leakage is not evidenced as assessed (no justification and no deduction found in the extracted record).

Transparency

verified The monitoring report (2011) provides a clear monitoring period (2008-01-28 to 2008-12-18) and the verified ERs match the claimed ERs (186,846).

missing Key baseline governance details (such as when the baseline was last reassessed and the grid EF vintage year) are not stated in the extracted record.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing certain downstream double-claiming/eligibility risks.

missing Project-specific baseline setting and missing leakage treatment increase over-crediting risk for an ACM0002 grid-displacement claim.

Documentation

verified Multiple core documents are available (PDD, validation report, monitoring report) with high extraction confidence and no material findings/corrective actions reported.

missing The extracted record shows internal inconsistencies on safeguards-related disclosures between the PDD and monitoring report.

Detailed Analysis

Integrity

Additionality appears reasonably supported: the validation/verification record indicates the VVB confirmed additionality using an investment test. For quantification, the monitoring report (2011) reports 186,846 tCO2e and the verified ERs equal the claimed ERs, suggesting no downward adjustment in that period. Integrity is weakened by the absence of an evidenced leakage assessment in the extracted record (leakage is marked as not addressed and no deduction is provided), and by missing baseline governance details such as the last baseline reassessment date.

Transparency

MRV transparency is moderate-to-good for the reported period: the monitoring report (2011) clearly states the monitoring window (2008-01-28 to 2008-12-18) and shows agreement between claimed and verified ERs (186,846). The VVB is identified (TÜV Rheinland Japan Ltd.), supporting audit traceability. Transparency is reduced because key contextual parameters (such as the grid emission factor vintage year and baseline reassessment timing) are not stated in the extracted record, limiting independent reproducibility checks.

Claim Safety

The project is explicitly not CORSIA-eligible, which lowers the risk of certain aviation-eligibility-related misclaims. However, the baseline is project-specific and the extracted record does not evidence a leakage justification or deduction, which can elevate over-crediting and greenwashing risk for grid-displacement accounting under ACM0002. CCP status is not found in the extracted record, so buyers cannot rely on an additional quality label without further confirmation.

Documentation

Documentation coverage is fairly strong: the extracted record includes a PDD, validation report, and monitoring report, with high extraction confidence and no material findings or corrective actions reported. The monitoring report is dated 2011-03-07 and covers the 2008 monitoring period, which is reasonably traceable to the early crediting years. Documentation quality is nonetheless weakened by contradictions between documents on safeguards-related disclosures, indicating inconsistent reporting rather than a single coherent evidence trail.

Overall

Overall quality is mid-range: quantified MRV for the stated period is consistent (claimed equals verified ERs in the monitoring report, 2011) and additionality is VVB-confirmed via an investment test. The main weaknesses are (1) leakage being marked as not addressed with no evidenced deduction, and (2) multiple safeguards-related contradictions. For the contradictions, I privilege the later monitoring report (2011) over the earlier PDD (2008) for whether safeguards/FPIC/grievance/benefit sharing are evidenced as implemented during operation, because it is closer to the monitored period; this inconsistency reduces confidence and is reflected in lower integrity/claim-safety/documentation scores.

Audit Analysis

This is a grid-connected hydropower project under ACM0002 with VVB-confirmed additionality and a clean verification outcome for the reported monitoring period. However, leakage treatment is not evidenced in the extracted record and social safeguard-related statements are inconsistent across documents, which increases credibility and reputational risk.

Project Description

This hydropower plant generates clean electricity and reduces greenhouse gas emissions by replacing fossil fuel-generated electricity from the Central China Grid. With an installed capacity of 135 MW, the plant supplies the grid with 191,627.9MWh of clean energy, contributing to a more sustainable future.

Red Flags

  • Leakage is marked as not addressed and no leakage deduction is evidenced in the extracted record, despite ACM0002 typically requiring an explicit leakage assessment.
  • Safeguards, FPIC, grievance mechanism, and benefit sharing are contradictory between the PDD (2008) and the monitoring report (2011), undermining confidence in social risk disclosures.

Credit Vintages

Issued Retired Available
2008
186,846 121,916 64,930
Total 186,846 121,916 64,930

Cosa migliorerebbe questo punteggio

  • Provide an explicit leakage assessment consistent with ACM0002 (including whether leakage is negligible and why, or a quantified deduction) in the monitoring/verification documentation.
  • Resolve safeguards inconsistencies by publishing clear evidence of stakeholder consultation/FPIC (if applicable), a functioning grievance mechanism, and any benefit-sharing arrangements, with consistent statements across PDD and monitoring/verification reports.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk evidenced

Leakage

Leakage not evidenced as assessed

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

Safeguards disclosures inconsistent across documents

Double-claim

Not CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti