Xinjiang A’letai Hua’ning Hydropower Project
Score Breakdown
Integrity
verified Additionality is stated as confirmed by the VVB, and no material findings or corrective actions are reported in the monitoring record (monitoring report, 2021).
missing Baseline is project-specific and the timing of any baseline reassessment is not stated; leakage is not addressed and no deduction is provided in the extracted record (monitoring report, 2021).
Transparency
verified Monitoring and crediting periods are clearly specified (2013-07-01 to 2020-06-30) and key parameters like the grid emission factor are reported (monitoring report, 2021).
missing Total emission reductions claimed and verified are not found in the extracted record, limiting traceability of issued outcomes (monitoring report, 2021).
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (monitoring report, 2021).
missing Contradictions on additionality approach and missing quantified ER claimed/verified increase over-crediting and greenwashing risk (validation report, 2012; monitoring report, 2021).
Documentation
verified Multiple core document types are present (monitoring report, PDD, validation report) and extraction confidence is high.
missing Some key fields are missing or not evidenced in the extracted record (e.g., ER claimed/verified, baseline reassessment, leakage deduction), indicating incomplete extractable documentation.
Detailed Analysis
Integrity
The project applies ACM0002 with a project-specific baseline and reports a grid emission factor of 0.7926 (monitoring report, 2021), which is consistent with standard grid-displacement accounting. Additionality is indicated as confirmed by the VVB, and the monitoring record shows no material findings or corrective actions (monitoring report, 2021). However, leakage is not addressed and no leakage deduction is stated, and the timing of any baseline reassessment is not provided in the extracted record (monitoring report, 2021), which weakens robustness.
Transparency
The monitoring period and crediting period are clearly stated as 2013-07-01 to 2020-06-30 (monitoring report, 2021), supporting temporal transparency. The VVB is identified as CEPREI Certification Body (monitoring report, 2021). But the extracted record does not include total emission reductions claimed or verified, limiting the ability to reconcile calculations to outcomes from the available extracted fields (monitoring report, 2021).
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of higher-stakes aviation claims (monitoring report, 2021). Nonetheless, over-crediting/claim risk is elevated because the extracted record lacks the total ER claimed and verified and because the additionality approach is inconsistent across documents (validation report, 2012; monitoring report, 2021). CCP status is not found in the extracted record, leaving uncertainty for high-integrity voluntary-claim alignment.
Documentation
The evidence set includes a monitoring report (dated 2021-09-10), a PDD, and a validation report, with five documents used and high extraction confidence, which supports document reliability overall. However, several important quantitative and procedural elements are not found in the extracted record (e.g., ER claimed/verified, leakage deduction, baseline reassessment timing), indicating documentation completeness gaps for scoring purposes.
Overall
Two contradictions materially affect confidence. For additionality, the validation report (2012-09-23) states an investment test while the monitoring report (2021-09-10) states a barrier analysis; the validation report is privileged because it is the primary document establishing additionality at registration, while the monitoring report may be summarizing or misclassifying the original test—this inconsistency lowers integrity and claim-safety. For safeguards, the validation report indicates safeguards were mentioned while the monitoring report indicates they were not; the more recent monitoring report is privileged for ongoing disclosure, but the inconsistency suggests uneven reporting quality and lowers transparency/documentation confidence. (Gate note: documentation is above 3.0 and integrity is above 4.0, so no deterministic caps would be triggered.)
Audit Analysis
This CDM hydropower project uses a standard grid-displacement methodology (ACM0002) with VVB involvement and no reported material findings, which supports basic MRV credibility. However, key integrity elements are weakly evidenced in the extracted record, including leakage treatment, baseline reassessment timing, and inconsistent statements on additionality approach and safeguards across documents.
Project Description
The objective of the project is the generation of zero carbon emission electricity from hydropower and the displacement of the same amount of electricity from the Northwest China Power Grid (NWPG) that is mainly dominated by electricity derived from coal-fired power plants.
Red Flags
- Contradictory additionality test type between the validation report (investment test) and the monitoring report (barrier analysis), raising reliability concerns.
- Leakage is not addressed in the extracted record and no leakage deduction is stated, despite being a core integrity element to document.
- Safeguards are inconsistently described across documents and FPIC/grievance mechanism/benefit sharing are not evidenced.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide (or extract) the verified and claimed total emission reductions for the monitoring period, with calculation spreadsheets and VVB verification statements to enable reconciliation.
- Clarify leakage treatment explicitly under ACM0002 for this hydropower context (including any applicable deduction or justification for zero) and document baseline reassessment/parameter update procedures.
- Resolve the additionality-test inconsistency by citing the definitive additionality assessment from the validation/registration package and ensuring consistent referencing in monitoring/verification documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but test type inconsistent across documents
Avoidance project type with no reversal events evidenced
Leakage not addressed and no deduction evidenced
Project-specific baseline; reassessment timing not evidenced
No FPIC or grievance mechanism evidenced; safeguards inconsistently reported
Not CORSIA-eligible; CCP status not evidenced
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →