Yalova Wind Power Plant Project
GS-188 ↗ · current registry ID: GS1318
#162of 1935 in Renewable energy#33of 295 in Turkey#56of 1801 in Gold Standard (GS)#118of 1287 in ACM0002
Audit Analysis
The Yalova Wind Power Plant is a Gold Standard wind project with VVB-confirmed additionality and smart-meter monitoring, delivering 148% of its pro-rata ex-ante expectation for the 2024 monitoring period. However, the project carries a heavy burden of 28 material findings and 28 corrective actions across multiple review cycles, seven cross-document contradictions, and a leakage justification that is explicitly marked as not addressed, all of which temper an otherwise sound renewable-energy credit.
Red Flags
- Leakage deduction is 0% with the justification explicitly recorded as 'not addressed' in the November 2025 verification report, despite an earlier June 2025 verification report describing it as 'quantified' — an unresolved inconsistency in how leakage is treated.
- Seven cross-document contradictions were identified, including conflicting baseline method labels ('project' in the verification report vs. 'jurisdictional' in the monitoring report) and two different crediting-period windows, raising data-reliability concerns.
- Twenty-eight material findings were logged across validation and verification cycles, including construction not being completed at the time of validation, turbine-model mismatches between the PDD and site observations, and errors in the financial cash-flow analysis (interest payments, debt-repayment timing).
- Free, Prior and Informed Consent (FPIC) was not conducted, although a grievance mechanism and benefit-sharing arrangement are documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 10,477 | 0 | 10,477 | |
| 2020 | 97,387 | 95,440 | 1,947 | |
| 2021 | 98,630 | 0 | 98,630 | |
| 2022 | 92,521 | 0 | 92,521 | |
| 2023 | 91,008 | 0 | 91,008 | |
| 2024 | 79,244 | 0 | 79,244 | |
| Total | 469,267 | 95,440 | 373,827 |
Risk Indicators
VVB-confirmed investment test
Wind — no carbon-stock reversal risk
0% deduction, justification not addressed
Project-specific, reassessed 2025, label conflict
Grievance & benefit-sharing present, no FPIC
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →