Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingVCSEnergy industries (renewable/non-renewable sources)TurkeyRegistry: RegisteredAMS-I.D

Yaprak-I Hydropower Plant, Turkey

Developer: RHG Enerturk Enerji Uretim ve Tic. A.S

VCS-1009 ↗

#3575of 5087 in Renewable energy#329of 431 in Türkiye#1246of 1608 in Verra (VCS)#1342of 2004 in AMS-I.D

Score from methodology v2.1 (analysis of 4 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 4.9 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

The Yaprak-I Hydropower Plant is a VCS-registered small hydropower project with a jurisdictional baseline and VVB-verified additionality, but its integrity is significantly undermined by extensive material findings including a miscalculation in the ER spreadsheet, shared metering with the adjacent Yaprak-II plant, and numerous inconsistencies between the monitoring report and the project design document. The project delivered approximately 85% of the pro-rata expected emissions reductions for the four-year monitoring period, which is within a reasonable range, but the Gold Standard registration history and unresolved double-claiming questions introduce additional risk.

Red Flags

5 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 4 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 5 red flags, score factors, detailed analysis, and 17 registry documents (17 analyzed).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons (public-data comparison is free; fair use: 30 projects per day). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not checked yet

    This registry publishes CORSIA labels, but CarbonMeld has not read this project's credit records yet: we cannot say whether its credits carry one. Check on the registry.

  • Integrity label (ICVCM CCP)

    Methodology not approved by ICVCMAMS-I.D

    The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.

    Source: ICVCM assessment

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not checked yet

    This registry publishes Article 6 authorizations, but CarbonMeld has not read this project's credit records yet: we cannot say whether any credits are authorized. Check on the registry.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

No issuances recorded on the registry.

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2013–2019AMS-I.D v16.0since replaced by v18.0

    monitoring report + verification report

    official page · verified on

  2. 2019–2023AMS-I.D v16.0since replaced by v18.0

    monitoring report + verification report

    official page · verified on

  • AMS-I.D: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceAMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →