Yongren Ganbala Grid-connected Photovoltaic Power Project-Pre CDM clone
GS-1309 ↗ · current registry ID: GS3028
#281of 1935 in Renewable energy#104of 1084 in China#114of 1801 in Gold Standard (GS)#212of 1287 in ACM0002
Audit Analysis
A grid-connected solar PV project in China under Gold Standard with a jurisdictional baseline and a combined additionality test, but the VVB did not explicitly confirm additionality, which is a notable integrity gap. Monitoring data is internally consistent and the project delivered roughly 75% of the pro-rata ex-ante expectation for the verified period. CORSIA and CCP eligibility are not stated, leaving dual-channel risk unaddressed.
Red Flags
- Additionality was assessed via a combined test but was not confirmed by the VVB (TÜV Rheinland), leaving the additionality claim unverified by the independent body.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the project's dual-channel crediting risk unassessed.
- A Clarification Request was raised in the verification report regarding the selection of minimum vs. maximum imported electricity values for conservative calculation, indicating some ambiguity in the baseline boundary.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 7,555 | 7,555 | 0 | |
| 2014 | 8,818 | 8,818 | 0 | |
| Total | 16,373 | 16,373 | 0 |
Risk Indicators
Combined test present but not VVB-confirmed
Technology-based PV; no carbon-stock reversal risk
0% deduction, justified as negligible for grid-connected solar
Jurisdictional baseline per verification report
Grievance mechanism and benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →