Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredAMS-III.G

Yueyang LFG Power Generation Project

VCS-4349 ↗

#160of 1084 in China#205of 1339 in Verra (VCS)#3of 34 in AMS-III.G

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

The Yueyang LFG Power Generation Project is a VCS-registered landfill methane recovery and grid-connected renewable electricity project with a VVB-verified combined additionality test and no material reversal risk. The first monitoring period delivered roughly 75% of the pro-rata ex-ante expectation, indicating conservative crediting. Key gaps include a project-specific (modeled) baseline, absence of a stated buffer pool, and missing CORSIA/CCP eligibility information.

Red Flags

  • Leakage justification is inconsistent between the monitoring report ('quantified') and the validation report ('deemed negligible'), though both result in a 0% deduction
  • CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed
  • Three corrective actions remain open (electricity generation estimate, overhaul period explanation, meter M2 details) per the verification report

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific, modeled baseline

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-III.G. Landfill methane recovery (version 10.0) and AMS-I.D. Grid-connected renewable electricity generation (Version 18.0)

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents