Yunnan Kunming Liangqu Improved Forest Management Project

VCS-1542 ↗

4.9 / 10
Integrity
5.8
Transparency
4.6
Claim Safety
4.2
Documentation
4.8

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, and the project has an 18% buffer pool in the issuance record.

missing A corrective action was required because the stratum was not consistent with the forest inventory evidence, and reversal treatment is not clearly addressed.

Transparency

verified The monitoring period and verified emission reductions are stated in the issuance record, and the VVB is identified as China Environmental United Certification Center Co., Ltd.

missing The extracted record does not state the usage monitoring method, and the registry status is on hold, which weakens public confidence.

Claim Safety

verified The project is marked as not CORSIA-eligible, which reduces dual-market claim risk.

missing The baseline is project-specific rather than jurisdictional, and contradictions exist on leakage justification and verified ER volume.

Documentation

verified The record draws on many documents, with 21 documents used and a medium extraction confidence level.

missing One key corrective action remains open, and the evidence set includes contradictions that reduce documentation reliability.

Detailed Analysis

Integrity

The issuance record shows additionality was verified by the VVB through an investment test, which is a meaningful positive. The project also reports an 18% buffer pool and a leakage deduction of 0%, but reversal events are not clearly addressed and the record includes a corrective action because the stratum was not consistent with forest second-class investigation data. The contradiction on buffer pool size, with earlier documents indicating 25% and the later issuance record showing 18%, suggests some uncertainty, so I privileged the more recent issuance record because it is the latest official document.

Transparency

The issuance record provides the monitoring period, the VVB name, and the verified ER volume, which supports basic transparency. However, the usage monitoring method is not stated in the extracted record, and the registry status is on hold, which limits confidence in public-facing completeness. The contradiction on verified ER volume, with earlier documents showing a lower figure and the issuance record showing 273,112, also weakens transparency because the final number depends on which document is treated as authoritative.

Claim Safety

Claim safety is weakened by the project-specific baseline and the lack of a clearly documented usage monitoring method. The project is marked as not CORSIA-eligible, which helps reduce dual-claim risk, but the contradiction on leakage justification is important: earlier material said leakage was not addressed, while the later issuance record says it was deemed negligible, so I privileged the later issuance record as more specific and more recent. The differing verified ER figures also raise over-crediting concerns, even though the issuance record is the best available source.

Documentation

Documentation is moderate because 21 documents were used and the extraction confidence is medium rather than low. The record includes safeguards, benefit sharing, and grievance mechanism information, but the presence of a corrective action and several contradictions shows that the documentation set is not fully clean. The crediting period is long and the monitoring period is much later, which is acceptable, but the overall file still has gaps in key operational details such as usage monitoring.

Overall

The project has some credible elements, especially VVB-verified additionality and a documented buffer pool, but the overall risk profile is held back by contradictory records and an open corrective action. I privileged the later issuance record for buffer pool size, leakage treatment, safeguards, and verified ER volume because it is more recent and more specific than the earlier documents. The registry being on hold is an important external warning sign, and the unresolved inconsistency in stratum evidence reduces confidence in the final claim.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality, a buffer pool, and a quantified leakage deduction of 0%. However, reliability is weakened by a corrective action on stratum consistency, an unresolved reversal treatment, and contradictions across documents on buffer pool size, leakage treatment, safeguards, and credited volume. The registry status is on hold, which further reduces confidence in the claim.

Project Description

The Yunnan Kunming Liangqu Improved Forest Management Project in China is protecting once-logged forests in Lianhe Township and Zhuanlong Town. By improving forest management and converting logged areas to protected forests, the project is reducing carbon emissions and improving the local ecological environment. This will result in significant carbon sequestration and contribute to the sustainable development of the ecosystem.

Red Flags

  • The registry status is on hold, and the issuance record includes a corrective action about inconsistent stratum evidence.
  • Multiple contradictions exist across documents, including buffer pool percentage, leakage justification, safeguards, and verified ER volume.

Credit Vintages

Issued Retired Available
2011
49,810 29,774 20,036
2012
46,386 46,386 0
2013
45,864 30,000 15,864
2014
30,000 30,000 0
2015
40,000 40,000 0
2016
51,900 9,174 42,726
2017
55,335 55,335 0
2018
54,765 27,067 27,698
2019
54,194 54,194 0
2020
53,622 53,622 0
2021
13,296 12,954 342
Total 495,172 388,506 106,666

Cosa migliorerebbe questo punteggio

  • Publish a clear reconciliation of all contradictory figures, especially buffer pool percentage, leakage treatment, and verified ER totals, with a document hierarchy explaining the final values.
  • Provide a complete, auditable explanation of reversal risk, stratum selection, and usage monitoring, and update the registry status once the hold is resolved.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

buffer pool present, reversal treatment unclear

Leakage

0% deduction with conflicting justification

Baseline

project baseline, reassessment timing missing

Safeguards

FPIC, grievance, and benefit sharing documented

Double-claim

not CORSIA-eligible and no CCP approval stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti