Yuntdag Wind Power Project, Turkey
GS-614 ↗ · current registry ID: GS352
#529of 1935 in Renewable energy#109of 295 in Turkey#261of 1801 in Gold Standard (GS)#402of 1287 in ACM0002
Audit Analysis
The Yuntdag Wind Power Project is a mature, VVB-verified wind facility in Turkey with confirmed additionality and reasonable leakage treatment, but its long history of corrective actions across multiple verification cycles, a project-specific baseline (contradicted by the monitoring report's 'jurisdictional' label), and low document extraction confidence temper confidence in data reliability. The project delivered approximately 93% of its pro-rata ex-ante expectation for the current monitoring period, indicating conservative rather than inflated crediting.
Red Flags
- Extensive history of corrective actions spanning verification cycles from 2008 to 2025, including missing meter data, calculation errors, and documentation gaps, indicating chronic monitoring quality issues
- Baseline method contradiction: the 2025 verification report classifies the baseline as 'project' while the 2025 monitoring report describes it as 'jurisdictional', creating ambiguity about the baseline's robustness
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and data completeness cannot be fully confirmed
- FPIC was not conducted (stated as false in the verification report), though a grievance mechanism and benefit-sharing arrangement are in place
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 68,435 | 68,435 | 0 | |
| 2009 | 93,737 | 93,737 | 0 | |
| 2010 | 92,886 | 92,886 | 0 | |
| 2011 | 138,505 | 138,505 | 0 | |
| 2012 | 144,733 | 144,733 | 0 | |
| 2013 | 141,271 | 141,271 | 0 | |
| 2014 | 116,022 | 116,022 | 0 | |
| 2015 | 30,582 | 30,582 | 0 | |
| 2016 | 102,713 | 102,713 | 0 | |
| 2017 | 109,344 | 108,878 | 466 | |
| 2018 | 108,280 | 108,280 | 0 | |
| 2019 | 110,897 | 110,897 | 0 | |
| 2020 | 123,030 | 99,308 | 23,722 | |
| 2021 | 116,316 | 41,264 | 75,052 | |
| 2022 | 124,282 | 71,797 | 52,485 | |
| 2023 | 112,482 | 58,355 | 54,127 | |
| 2024 | 149,347 | 0 | 149,347 | |
| 2025 | 24,925 | 0 | 24,925 | |
| Total | 1,907,787 | 1,527,663 | 380,124 |
Risk Indicators
VVB-confirmed combined test (2025)
Wind technology – no carbon-stock reversal risk
0% deduction, quantified justification
Project-specific; contradicted by monitoring report
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →