Zeytineli Wind Power Project, Turkey
GS-1221 ↗ · current registry ID: GS845
#325of 1935 in Renewable energy#73of 295 in Turkey#142of 1801 in Gold Standard (GS)#246of 1287 in ACM0002
Audit Analysis
The Zeytineli Wind Power Project is a Gold Standard wind energy project with VVB-confirmed additionality and no carbon-stock reversal risk, but it carries a notable documentation quality burden (30 corrective action requests) and a pending forward action on carbon-revenue materiality. Multiple contradictions across documents—particularly on the baseline method, grid emission factor, and lifetime ERR—reduce confidence in the data record. The project delivered roughly 102% of its pro-rata expectation for the 2024 monitoring year, indicating no material over-crediting.
Red Flags
- 30 corrective action requests were issued during verification (PDD compliance, turbine description, grid EF, stakeholder engagement, bird monitoring, SDG tool), indicating significant documentation and design-quality gaps that had to be remediated before closure.
- A forward action (FAR#01) remains open requiring the project to demonstrate the materiality of carbon revenue to project sustainability at the next issuance, raising a residual additionality question.
- Seven contradictions were identified across documents, including a 34% gap in the lifetime ex-ante ERR (723,170 vs 473,230 tCO₂) and a conflicting baseline method (project-specific vs jurisdictional), which undermines data reliability.
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's presence in a local community in Turkey.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 48,570 | 0 | 48,570 | |
| 2023 | 56,366 | 0 | 56,366 | |
| Total | 104,936 | 0 | 104,936 |
Risk Indicators
VVB-confirmed investment test
Wind – no carbon-stock reversal risk
0% – negligible for wind
Project-specific; doc conflict
Grievance present; FPIC not conducted
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →