Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredACM0010

Zhenyuan Swine Farm AWMS GHG Mitigation Project

VCS-4367 ↗

#239of 1084 in China#291of 1339 in Verra (VCS)#9of 66 in ACM0010

5.8/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The Zhenyuan Swine Farm AWMS project is a VCS-registered anaerobic wastewater treatment project in China with a VVB-confirmed investment additionality test and no reversal events, but it relies on a project-specific modeled baseline and several key transparency indicators (FNRB, buffer pool, CORSIA status) are not stated in the available documents. The low extraction confidence across 13 source documents limits the reliability of the extracted record, and three inter-document contradictions—while largely explainable—introduce residual uncertainty.

Red Flags

  • Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of all extracted figures
  • Project-specific modeled baseline (not jurisdictional) with no stated reassessment date, though the 10-year VCS ALM reassessment is not yet due
  • FNRB value and method are not stated, preventing independent verification of the baseline emission factor

Credit Vintages

IssuedRetiredAvailable
2021
1,03801,038
2022
3,96203,962
Total5,00005,000

Risk Indicators

Additionality

Investment test VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

Quantified as negligible per TOOL13/14

Baseline

Project-specific modeled, FNRB unstated

Safeguards

FPIC, grievance, safeguards documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents