Skip to main content
GSSmall, Low - Impact HydroChinaAMS-I.D

Zhongshan County Micro Hydro Project Bundle No.2

GS-71 ↗ · current registry ID: GS1100

#240of 1084 in China#262of 1801 in Gold Standard (GS)#183of 806 in AMS-I.D

5.8/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A micro-hydro project in China with verified additionality and smart-meter monitoring, but hampered by multiple calculation errors requiring corrective action, a project-specific baseline (contradicted by an earlier 'jurisdictional' label), and the absence of FPIC. The project delivered roughly 90% of its pro-rata emission-reduction expectation for the elapsed monitoring period, which is within acceptable variance for a small hydro scheme.

Red Flags

  • Multiple calculation errors identified in the 2025 verification report (CAR-1: wrong day-count for electricity export/import in May 2017; CAR-2: Gongtan station reported zero grid import inconsistent with ETNs), indicating weak internal QA before submission
  • FPIC was not conducted despite the project operating in a rural Chinese county, and the 2020 monitoring report did not document a grievance mechanism or benefit-sharing plan (both confirmed only in the 2025 verification report)
  • Baseline method is contradictory across documents: the 2025 verification report states a project-specific baseline while the 2020 monitoring report describes a jurisdictional baseline, creating uncertainty about which method actually underpins the credit calculation

Credit Vintages

IssuedRetiredAvailable
2011
1,1081,08622
2012
2,3842,33747
2013
3,6252,883742
2014
3,3341,0912,243
2015
3,4673,333134
2016
4,4594,4590
2017
3,6423,6420
2018
2,6462,6460
2019
2,3862,3860
2020
2,4562,4560
2021
2,4582,44711
2022
2,53502,535
2023
2,50502,505
2024
2,55402,554
Total39,55928,76610,793

Risk Indicators

Additionality

VVB-confirmed (2025)

Permanence

Hydro – no carbon-stock reversal risk; smart-meter monitoring in place

Leakage

0% deduction, quantified justification (reasonable for hydro)

Baseline

Project-specific method; contradicted by 'jurisdictional' in 2020 report

Safeguards

Grievance mechanism and benefit-sharing confirmed (2025); FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents