Zhongshan County Micro Hydro Project Bundle No.2
GS-71 ↗ · current registry ID: GS1100
#240of 1084 in China#262of 1801 in Gold Standard (GS)#183of 806 in AMS-I.D
Audit Analysis
A micro-hydro project in China with verified additionality and smart-meter monitoring, but hampered by multiple calculation errors requiring corrective action, a project-specific baseline (contradicted by an earlier 'jurisdictional' label), and the absence of FPIC. The project delivered roughly 90% of its pro-rata emission-reduction expectation for the elapsed monitoring period, which is within acceptable variance for a small hydro scheme.
Red Flags
- Multiple calculation errors identified in the 2025 verification report (CAR-1: wrong day-count for electricity export/import in May 2017; CAR-2: Gongtan station reported zero grid import inconsistent with ETNs), indicating weak internal QA before submission
- FPIC was not conducted despite the project operating in a rural Chinese county, and the 2020 monitoring report did not document a grievance mechanism or benefit-sharing plan (both confirmed only in the 2025 verification report)
- Baseline method is contradictory across documents: the 2025 verification report states a project-specific baseline while the 2020 monitoring report describes a jurisdictional baseline, creating uncertainty about which method actually underpins the credit calculation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 1,108 | 1,086 | 22 | |
| 2012 | 2,384 | 2,337 | 47 | |
| 2013 | 3,625 | 2,883 | 742 | |
| 2014 | 3,334 | 1,091 | 2,243 | |
| 2015 | 3,467 | 3,333 | 134 | |
| 2016 | 4,459 | 4,459 | 0 | |
| 2017 | 3,642 | 3,642 | 0 | |
| 2018 | 2,646 | 2,646 | 0 | |
| 2019 | 2,386 | 2,386 | 0 | |
| 2020 | 2,456 | 2,456 | 0 | |
| 2021 | 2,458 | 2,447 | 11 | |
| 2022 | 2,535 | 0 | 2,535 | |
| 2023 | 2,505 | 0 | 2,505 | |
| 2024 | 2,554 | 0 | 2,554 | |
| Total | 39,559 | 28,766 | 10,793 |
Risk Indicators
VVB-confirmed (2025)
Hydro – no carbon-stock reversal risk; smart-meter monitoring in place
0% deduction, quantified justification (reasonable for hydro)
Project-specific method; contradicted by 'jurisdictional' in 2020 report
Grievance mechanism and benefit-sharing confirmed (2025); FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.