Skip to main content
GSSmall, Low - Impact HydroChinaAMS-I.D

Zhongshan County Micro Hydro Project Bundle No.3

GS-72 ↗ · current registry ID: GS1101

#107of 1084 in China#116of 1801 in Gold Standard (GS)#103of 806 in AMS-I.D

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A small grid-connected micro-hydro project under Gold Standard with VVB-confirmed additionality, smart-meter monitoring, and verified emissions reductions that exceed the claimed figure for the 2021–2024 period. Several contradictions across verification reports (baseline method, grid emission factor, additionality status) and gaps in FNRB, CORSIA, and CCP data moderate confidence, but no evidence of over-crediting or material integrity failures was found.

Red Flags

  • Baseline method is described as 'project' in the 2020 verification report but 'jurisdictional' in the 2025 monitoring report — an unresolved inconsistency that affects baseline credibility
  • Grid emission factor differs between reports (0.6323 in 2020 vs 0.4472 in 2025, both attributed to 2016), and the rationale for the change is not explained in the extracted record
  • Additionality was recorded as unverified in the 2018 verification report but confirmed in the 2025 report; the specific additionality test type is not stated in any document
  • An open corrective action requires the project to implement a process for timely annual report submission, indicating a prior compliance lapse

Credit Vintages

IssuedRetiredAvailable
2011
1,2411,21724
2012
4,6194,52792
2013
5,2435,16776
2014
3,7663,7660
2015
4,0584,0580
2016
4,4404,4400
2017
3,9963,9960
2018
3,4793,4790
2019
2,7552,74411
2020
2,7882,7880
2021
2,8142,80113
2022
2,69602,696
2023
2,89102,891
2024
3,08003,080
Total47,86638,9838,883

Risk Indicators

Additionality

VVB-confirmed but test type unspecified; 2018 vs 2025 contradiction

Permanence

Grid-connected renewable — no carbon-stock reversal risk

Leakage

0% deduction with quantified justification (grid-connected hydro)

Baseline

Project vs jurisdictional contradiction across reports

Safeguards

Grievance mechanism and benefit sharing documented; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS I.D. - Grid Connected Renewable Electricity Generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents