Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingCDMTidalSouth KoreaRegistry: RegisteredACM0002

Sihwa Tidal Power Plant CDM Project

Developer: Korea Water Resources Corporation(K-water)

CDM-0349 ↗

#27of 84 in South Korea#1415of 5732 in CDM (UNFCCC)#1221of 3458 in ACM0002

Score from methodology v2.1 (analysis of 24 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.8 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

The Sihwa Tidal Power Plant is a well-established CDM renewable-energy project displacing Korean grid electricity, with a reasonable grid-based baseline and a 0% leakage deduction that is appropriate for the sector. However, the extracted record lacks a confirmed additionality test type, a verified ERR figure, and shows several resolved material findings and documentation corrective actions, which temper confidence in the MRV chain. The project delivered roughly 86% of its pro-rata ex-ante expectation for the monitored year, indicating conservative crediting.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 24 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 4 red flags, score factors, detailed analysis, and 14 registry documents (14 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

Transactions in the CDM registry are discontinued as of 31 December 2026 (UNFCCC, checked 6 October 2026). The UNEP-CCC Article 6 Pipeline lists a request to move this activity to the Article 6.4 mechanism of the Paris Agreement. This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: methodology

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2012
108,1840108,184
2013
325,0870325,087
2014
313,6010313,601
2015
327,2360327,236
2016
324,1530324,153
2017
328,7370328,737
2019
493,2810493,281
2020
361,2980361,298
2021
118,5480118,548
Total2,700,12502,700,125

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2012–2017ACM0002version not confirmed in the document text

    monitoring report

  2. 2018ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  3. 2019ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  4. 2019ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  5. 2020ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  6. 2020ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  7. 2021ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  8. 2021–2022ACM0002 v17.0since replaced by v22.0

    monitoring report

    official page · verified on

  • ACM0002: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →