SEFERIHISAR WPP
Developer: GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Methodology: ACM0002 (CDM)
#312of 413 in Türkiye#182of 233 in Global Carbon Council (GCC)#2064of 3246 in ACM0002
Score from methodology v2.1 (analysis of 26 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Pilot phase only (2021–2023)
Eligible only for the pilot phase: not usable for the current 2024–2026 phase.
Source: registry label · read on 1 Nov 2026
Covers: credits of this project that carry the label on the registry — not every unit or lot
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit Vintages
Issuance data not yet available — check back soon.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
Period not statedACM0002 v20.0since replaced by v22.0
verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Milagres SolarGCC-1329
- BT1 WindfarmGCC-648
- Inner Mongolia Guyang Hongnijing 100MW wind power projectGCC-749
- 99.216 MWp Bundled Solar Power Plant in VietnamGCC-513
- 190 MW Solar Power PV ProjectGCC-417
- 220 MW Wind Project in TNGCC-559
- Brigida and Bon Nome Renewable Energy ProjectGCC-1175
- Solar Project by Vector Green Prayagraj Solar Private LimitedGCC-169
