Skip to main content
ScoredGCCBrazilRegistry: RegisteredACM0002

90MW Cristalândia Wind Power Project in Brazil by CGN

Developer: CGN Brasil Energia e Participações S.A

GCC-592 ↗

#1510of 3942 in Renewable energy#97of 378 in Brazil#157of 232 in Global Carbon Council (GCC)#1050of 2684 in ACM0002

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.6 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 90 MW wind power project in Brazil with a jurisdictional grid baseline and VVB-confirmed investment additionality, but significant claim-safety concerns arise from CORSIA eligibility, a resolved I-REC double-counting issue, and a 35% discrepancy between the PDD and verification report on lifetime emissions reductions. No monitoring-period data is available, limiting verification of actual delivery.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 4 red flags, score factors, detailed analysis, and 8 registry documents (8 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Pilot phase only (2021–2023)

    Eligible only for the pilot phase: not usable for the current 2024–2026 phase.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages

Issuance data not yet available — check back soon.

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. Period not statedACM0002 v21.0since replaced by v22.0

    verification report

    official page · verified on

  • ACM0002: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →