Re-assessment pending
50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH
- Standard
- VCS
- Methodology
- ACM0002 (CDM)
- Registry
- VCS-3545 ↗ · Registered
- Country
- Bangladesh
- Credit type
- Energy industries (renewable/non-renewable sources)
- Developer
- HDFC Sinpower Limited
Score from methodology v2.1 (analysis of 1 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Oct 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 8,391 | 0 | 8,391 | |
| 2021 | 55,480 | 0 | 55,480 | |
| 2022 | 36,116 | 0 | 36,116 | |
| Total | 99,987 | 0 | 99,987 |
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Grid-connected Solar PV project in BokholVCS-1774
- Aslancik Hydro Power Plant ProjectVCS-917
- Inner Mongolia Jingneng Saihan Wind Farm Phase I ProjectVCS-850
- Inner Mongolia Yihewusu Phase II 49.5 MW Wind Power ProjectVCS-1001
- Bundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)VCS-249
- Xinjiang Dabancheng Sanchang Phase III Wind Power ProjectVCS-470
- Guohua Wulate Zhongqi Phase I 49.5 MW Wind Farm ProjectVCS-1204
- Xinjiang Dabancheng Sanchang First Phase Wind Farm ProjectVCS-89
