50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH
#1of 10 in Bangladesh#22of 629 in Verra (VCS)#11of 383 in ACM0002
Audit Analysis
A 50 MW solar park in Bangladesh under VCS methodology ACM0002 with a jurisdictional grid-emission-factor baseline and VVB-confirmed combined additionality test. The project is structurally sound for a renewable-energy credit, with no permanence or leakage risk, though the ERR figures show a 16% discrepancy between the PDD and validation report, and several transparency fields (CORSIA, CCP, FPIC) remain unaddressed in the available documents.
Red Flags
- ERR discrepancy of ~16% between the PDD (86,407 tCO2) and the validation report (99,987 tCO2) — the validation report is privileged as the more recent and authoritative document, but the gap warrants scrutiny
- Claimed and verified ERR are identical (99,987), which while plausible for a straightforward energy×EF calculation, leaves no visible margin of independent recalculation in the extracted record
- FPIC status is not stated in any available document, creating a gap in the social-safeguards evidence chain
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 8,391 | 0 | 8,391 | |
| 2021 | 55,480 | 0 | 55,480 | |
| 2022 | 36,116 | 0 | 36,116 | |
| Total | 99,987 | 0 | 99,987 |
Risk Indicators
VVB-confirmed combined test
Renewable energy – no reversal risk
0% – negligible for grid-connected solar
Jurisdictional grid EF (2020)
Grievance & benefit sharing present; FPIC not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →