1.2 MW Small Scale Hydro Power Project by M/s Flowgen Renewable Energy Pvt. Ltd
#556of 770 in Renewable energy#10of 13 in Himachal Pradesh India#146of 421 in Universal Carbon Registry (UCR)#263of 417 in AMS-I.D
Audit Analysis
A 1.2 MW small-scale hydro project in Himachal Pradesh registered under the UCR standard with a jurisdictional baseline and smart-meter monitoring, but the available record consists of only a single PDD with no verification report, no named VVB, and no documented additionality test. The project type carries inherent permanence advantages, yet the absence of a buffer pool, verified emissions figures, and safeguards detail leaves significant evidence gaps that limit confidence in the claimed 3,784 tCO₂e.
Red Flags
- No verification body (VVB) is named in the available record, and no additionality test type or VVB confirmation is documented, leaving the additionality claim unverified.
- Only a single PDD (dated 2022-12-23) is available; no verification report, monitoring report, or VVB audit report was found, making it impossible to confirm that the claimed 3,784 tCO₂e has been independently verified.
- No buffer pool or permanence-risk mitigation mechanism is documented, and no reversal events are confirmed absent (field is empty rather than explicitly zero).
- FPIC and grievance mechanism fields are empty despite safeguards being mentioned, leaving the social-safeguards picture incomplete.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not documented
No buffer pool; reversal risk unquantified
0% deduction, deemed negligible for hydro
Jurisdictional method; reassessment date not stated
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →