Skip to main content
UCRGujarat India.AMS-I.D

2.6 MW Small Scale Wind Power Project by M/s Coraplast Industries.

UCR-242 ↗

#512of 770 in Renewable energy#7of 33 in Gujarat India.#74of 421 in Universal Carbon Registry (UCR)#211of 417 in AMS-I.D

3.8/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
5.5
Documentation
2.5

Audit Analysis

A 2.6 MW small-scale wind project in Gujarat, India, registered under the UCR registry using the AMS-I.D. methodology. The project type carries inherently low permanence and leakage risk, and the jurisdictional baseline with a 2021 grid emission factor of 0.9 tCO₂/MWh is reasonable. However, the evidence base is limited to a single PDD with no verification report, no monitoring data, and no confirmed VVB sign-off, creating significant uncertainty around additionality and actual emissions reductions.

Red Flags

  • No verification report or VVB confirmation is available in the extracted record; additionality test type and VVB verification are both unconfirmed
  • No monitoring report or verified ERR figures exist; the only ERR figure (4,099 tCO₂) is an ex-ante claim from the PDD with no independent validation
  • Only one document (the PDD dated 2022-10-20) is in the evidence base, leaving the project's ongoing compliance and performance unverified

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test likely in PDD but VVB verification unconfirmed

Permanence

Physical wind asset, no reversal events reported

Leakage

0% deemed negligible, consistent with grid-connected wind

Baseline

Jurisdictional baseline, reassessment timing not stated

Safeguards

Mentioned in PDD but FPIC and grievance mechanism unconfirme

Double-claim

CORSIA and CCP status both unconfirmed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents