3 MW Bundled Wind Power Project
#597of 770 in Renewable energy#26of 42 in Gujarat India#208of 421 in Universal Carbon Registry (UCR)#300of 417 in AMS-I.D
Audit Analysis
A 3 MW wind project in Gujarat registered on the UCR voluntary registry with a jurisdictional baseline and a conservative lifetime ERR of 4,730 tCO₂e, but the available record consists solely of a PDD with no verification report, no named VVB, and no monitoring data. Additionality is neither described nor independently verified, and no buffer pool or permanence mechanism is documented. The project is in an early documentation stage with significant evidence gaps that limit confidence in its integrity and transparency.
Red Flags
- No verification body (VVB) is named in any available document; additionality is neither described nor independently confirmed
- Only a single PDD (dated 2023-09-08) is in the record — no verification report, monitoring report, or VVB audit is available
- The claimed lifetime ERR of 4,730 tCO₂e over a 10-year crediting period appears very low for a 3 MW wind turbine in Gujarat (a typical 25–35 % capacity factor would yield roughly 50,000–70,000 tCO₂e), raising a data-reliability question
- No buffer pool or permanence mechanism is documented, and no reversal events are either confirmed or ruled out
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No VVB-verified test found in record
No buffer pool; reversal risk unaddressed
0 % deemed negligible – reasonable for grid-displacement win
Jurisdictional baseline, 0.9 tCO₂/MWh grid EF
Safeguards mentioned; no FPIC or grievance mechanism documen
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →