Renewable Biomass Based Power Generation, Harinbhatta, Chhattisgarh
#84of 196 in Biomass#4of 421 in Universal Carbon Registry (UCR)#151of 417 in AMS-I.D
Audit Analysis
A grid-connected biomass power project under the UCR registry using the well-established AMS-I.D methodology, with a jurisdictional baseline and a barrier-based additionality test. However, the available record consists solely of the PDD; no verification report, monitoring report, or independent verification body is identified, leaving the claimed 289,576 ERR unverified and key integrity mechanisms (buffer pool, permanence safeguards) undocumented.
Red Flags
- No verification or accreditation body is named in the available record; additionality was assessed via a barrier test but no independent verification is confirmed
- Only a single document (the PDD) is available; no verification report, monitoring report, or registry listing was found to corroborate the 289,576 claimed ERR
- No buffer pool or permanence mechanism is described, and no reversal events are reported or excluded
- CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Barrier test identified but no VVB verification confirmed
No buffer pool or permanence mechanism stated
Deemed negligible, consistent with grid-connected renewable
Jurisdictional method appropriate; reassessment timing not s
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →