Skip to main content
UCRGujarat IndiaAMS-I.D

4 MW Small Scale Solar Power Project by M/s Covertek Ceramica Pvt. Ltd.

UCR-506 ↗

#444of 770 in Renewable energy#2of 42 in Gujarat India#7of 421 in Universal Carbon Registry (UCR)#157of 417 in AMS-I.D

4.3/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 4 MW grid-connected solar project in Gujarat, India, registered under the UCR standard using the AMS-I.D methodology. The jurisdictional baseline and negligible leakage assumption are appropriate for the project type, but the available record consists solely of the PDD with no verification report, no identified verification body, and no stated additionality test, leaving significant evidence gaps on the core integrity claims.

Red Flags

  • No verification body is identified in the available record; additionality test type and VVB confirmation are both absent from the extracted data
  • Only a single document (the PDD dated 28 Feb 2025) is available; no verification report or monitoring report has been extracted
  • CORSIA eligibility and CCP approval status are not stated, leaving double-claiming risk unassessed
  • No buffer pool percentage is specified, and permanence risk from early decommissioning of solar panels is unaddressed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

No buffer pool specified; low inherent risk for solar

Leakage

0% deemed negligible; appropriate for grid-connected solar

Baseline

Jurisdictional method; no reassessment date recorded

Safeguards

Mentioned in PDD; FPIC and grievance mechanism not documente

Double-claim

CORSIA and CCP status not stated; risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents