8.1 MW bundled Wind power project in Gujarat, India

UCR-86 ↗

#496of 770 in Renewable energy#7of 42 in Gujarat India#53of 421 in Universal Carbon Registry (UCR)#195of 417 in AMS-I.D

4.0/ 10
Integrity
3.8
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

An 8.1 MW wind power project in Gujarat registered under the UCR registry, using the well-established AMS-I.D methodology with a jurisdictional baseline and a reasonable 0.9 tCO2/MWh grid emission factor. However, the available record consists solely of the PDD, with no verification report, monitoring report, or VVB identification, leaving additionality verification, permanence safeguards, and actual credit issuance unconfirmed.

Red Flags

  • No verification report or VVB report found in the available record; additionality verification by an independent body cannot be confirmed
  • No total ERR claimed or verified figures available, making it impossible to assess over- or under-crediting
  • No crediting period stated in the extracted record, limiting the ability to assess project lifecycle and baseline reassessment timing
  • Buffer pool or permanence mechanism not stated, leaving reversal risk unaddressed in the available documentation

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test in PDD but VVB verification unconfirmed

Permanence

No buffer pool or permanence mechanism stated

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional baseline, reassessment timing not stated

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents