Audit Analysis
A 10 MW grid-connected solar project in Karnataka using a well-established methodology (AMS.I-D v18.0) with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO₂/MWh. However, the available record consists of a single PDD filed after the crediting period ended, with no verification report, no VVB identified, no ERR figures, and no documented additionality test — leaving the project's integrity and claim safety largely unverifiable from the extracted data.
Red Flags
- No additionality test type or VVB verification is documented in the available record; the PDD does not specify which test (investment, regulatory, or barrier) was applied.
- No VVB name is identified and no verification or monitoring report is present in the extracted documents, making independent assurance unverifiable.
- Neither claimed nor verified ERR figures are available, so over- or under-delivery cannot be assessed.
- The PDD is dated 24 January 2025, after the crediting period ended on 31 December 2023, raising questions about the filing timeline and whether monitoring data was ever formally reported.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No test type or VVB confirmation documented
RE project – no biogenic carbon, no reversal risk
0% – reasonable for grid-connected solar
Jurisdictional, grid EF 0.9, no reassessment date
Mentioned; no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →