5.00 MW Small Scale Hydro Power project by M/S Padhas Hydel Projects Pvt Ltd, Himachal Pradesh

UCR-59 ↗

#475of 770 in Renewable energy#34of 421 in Universal Carbon Registry (UCR)#178of 416 in AMS-I.D

4.1/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 5 MW small-scale hydro project in Himachal Pradesh registered under the UCR standard with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO₂/MWh. However, the available record consists solely of the Project Design Document; no verification report, monitoring report, or VVB identification is present, leaving additionality, actual emissions reductions, and permanence unverified. The project shows no material findings or corrective actions, but the absence of independent verification data significantly limits confidence in the claimed credits.

Red Flags

  • No verification report or VVB identification found in the available record; additionality is neither stated nor independently confirmed
  • No ERR figures (claimed or verified) are available, making it impossible to assess over- or under-crediting
  • Only a single document (PDD) is in the evidence base; no monitoring report covers the full 2017–2021 crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

Hydro asset – low inherent reversal risk

Leakage

0% deemed negligible – reasonable for renewable energy

Baseline

Jurisdictional baseline with grid EF 0.9

Safeguards

FPIC and safeguards mentioned; grievance mechanism not state

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents