Skip to main content
UCRRajasthan India.AMS-I.D

1.7 MW Roof Top Solar Power Project by Lagnam Spintex Limited

UCR-154 ↗

#725of 770 in Renewable energy#401of 421 in Universal Carbon Registry (UCR)#406of 417 in AMS-I.D

2.5/ 10
Integrity
2.5
Transparency
1.5
Claim Safety
3.5
Documentation
2.5

Audit Analysis

This 1.7 MW rooftop solar project in Rajasthan, India is registered under the UCR standard with a jurisdictional baseline and a 0% leakage deduction deemed negligible. However, the available documentation consists solely of a Project Design Document (PDD) from May 2021, with no verification report, monitoring report, or VVB assessment in the record. The absence of any additionality test documentation, ERR figures, or permanence mechanism represents a significant evidence gap that prevents meaningful quality assessment.

Red Flags

  • No additionality test type or VVB verification of additionality found in any available document
  • No verification report, monitoring report, or VVB report present in the evidence set — only a single PDD
  • No ERR figures (claimed or verified) available to assess over- or under-crediting
  • Crediting period of approximately 11 months (Jan–Dec 2022) is unusually short for a 1.7 MW solar installation
  • No buffer pool or permanence mechanism documented despite the project being a renewable energy generation project

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test documented

Permanence

No buffer pool stated; no reversals reported

Leakage

0% deduction, thin justification

Baseline

Jurisdictional baseline, no reassessment date

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents