1.50 MW bundled Solar PV projects in Dhar Tatoh, Distt. Bilaspur, Himachal Pradesh, India
#481of 770 in Renewable energy#39of 421 in Universal Carbon Registry (UCR)#183of 416 in AMS-I.D
Audit Analysis
A small 1.50 MW solar PV project under the UCR standard with a jurisdictional baseline and a reasonable 0% leakage treatment, but the available record consists of only a single PDD with no independent verification, monitoring report, or VVB assessment. The project type is inherently low-risk for over-crediting and reversal, yet the absence of any third-party verification or quantified ERR figures leaves the integrity and transparency of the claims largely unconfirmed.
Red Flags
- No verification report, monitoring report, or VVB assessment found in the available record — only a single PDD was used
- Additionality test type and VVB confirmation are not stated in any available document
- No ERR figures (claimed or verified) are available, making it impossible to assess over- or under-delivery
- Grid emission factor is from 2014, six years before the project start date in 2020
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not documented; no VVB confirmation found
Avoidance project; no reversal risk or events reported
0% deduction, deemed negligible — consistent with PV displac
Jurisdictional baseline with stated grid EF (0.9, 2014)
FPIC and benefit sharing documented; grievance mechanism not
CORSIA and CCP status both unstated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →