Skip to main content
UCRChamba Himachal Pradesh IndiaAMS-I.D

2.00 MW Kalm Small Hydro Power project by Sunshine Hydro Power Limited, Himachal Pradesh, India

UCR-64 ↗

#487of 770 in Renewable energy#4of 6 in Chamba Himachal Pradesh India#44of 421 in Universal Carbon Registry (UCR)#188of 417 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 2 MW small hydro project under the UCR registry with a jurisdictional baseline and reasonable leakage treatment, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB confirmation. The absence of any verified emission reduction figures, additionality test details, or third-party verification data creates significant evidence gaps that limit confidence in the project's integrity and transparency.

Red Flags

  • No verification report or VVB report found in the available record; additionality test type and VVB confirmation are not stated
  • No emission reduction figures (claimed or verified) are available in any document, making over-crediting risk unassessable
  • Only a single document (PDD) is available; no monitoring report, MRV data, or third-party verification exists in the record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not stated in available recor

Permanence

Hydro project; no carbon stock; no reversal events reported

Leakage

0% deduction, deemed negligible; consistent with hydro proje

Baseline

Jurisdictional baseline with stated grid EF of 0.9 tCO₂/MWh

Safeguards

FPIC and benefit sharing documented; grievance mechanism not

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents