Skip to main content
UCRGujaratAMS-I.D

2.736 MW Bundled Solar Power Project activity in Gujarat.

UCR-577 ↗

#594of 770 in Renewable energy#2of 9 in Gujarat#204of 421 in Universal Carbon Registry (UCR)#298of 417 in AMS-I.D

3.3/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
5.5
Documentation
2.5

Audit Analysis

A small 2.736 MW grid-connected solar project in Gujarat under the UCR registry, assessed solely from a single PDD document. The project type carries inherently low permanence and leakage risk, and a jurisdictional baseline with a 0.9 tCO₂/MWh grid factor is reasonable. However, the complete absence of any additionality evidence, independent verification, or ERR figures makes it impossible to confirm the project's climate claims.

Red Flags

  • No additionality test type or VVB verification found in any available document — the project's additionality is entirely unverified
  • No verification report, monitoring report, or VVB identification present; only a single PDD was used for assessment
  • No ERR figures (claimed or verified) available, making over- or under-crediting impossible to assess
  • CORSIA eligibility and CCP status both unstated, leaving dual-channel risk unaddressed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB verification found

Permanence

Solar asset — no inherent reversal risk

Leakage

0% deduction, justified as negligible for grid-connected sol

Baseline

Jurisdictional baseline stated, but no reassessment date or

Safeguards

Safeguards and benefit sharing mentioned, but no FPIC or gri

Double-claim

CORSIA and CCP status both unstated — dual-channel risk unad

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents