Skip to main content
UCRGujarat IndiaAMS-I.D

1.6 MW Bundled Wind Power Project by MFPL

UCR-410 ↗

#509of 770 in Renewable energy#8of 42 in Gujarat India#68of 421 in Universal Carbon Registry (UCR)#205of 417 in AMS-I.D

3.8/ 10
Integrity
4.0
Transparency
3.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A 1.6 MW wind power project in Gujarat registered under the UCR using CDM methodology AMS-I.D, with a jurisdictional baseline and a grid emission factor of 0.9 tCO₂/MWh. The project shows no material findings or corrective actions, but the available record consists solely of a PDD — no verification reports, monitoring reports, or VVB identification are present, leaving additionality verification and all ERR claims unconfirmed.

Red Flags

  • No verification body (VVB) is identified in the available record, and additionality test type and VVB confirmation are not stated, leaving the additionality claim unverified.
  • No verification reports or monitoring reports are present in the extracted record for a project operating since 2013; all ERR figures (claimed and verified) are absent.
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claiming risk unassessed.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not explicitly stated or VVB-confirmed in available rec

Permanence

Avoidance project; no carbon stock; no reversal events repor

Leakage

0% deduction; deemed negligible — appropriate for wind

Baseline

Jurisdictional baseline; no reassessment date or VVB confirm

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents