4.5 MW Small Scale Wind Power Project by Nutan Wind Farms in Gujarat, India
#602of 770 in Renewable energy#27of 42 in Gujarat India#214of 421 in Universal Carbon Registry (UCR)#303of 417 in AMS-I.D
Audit Analysis
A 4.5 MW wind power project in Gujarat using a jurisdictional baseline and the well-established AMS-I.D. methodology, with no material findings or corrective actions. However, the available record consists solely of a PDD with no verification reports, monitoring reports, or VVB documentation, making it impossible to independently confirm additionality, ERR delivery, or MRV quality. The project type carries inherently low permanence and leakage risk, but the evidentiary gap is substantial.
Red Flags
- No verification report, monitoring report, or VVB report found in the extracted record — only a single PDD is available, leaving additionality verification, ERR delivery, and MRV quality entirely unconfirmed
- Both total ERR claimed and total ERR verified are absent from the record, making any assessment of over- or under-crediting impossible
- Additionality test type and VVB confirmation are not stated in the available documents, despite being mandatory under AMS-I.D.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in available recor
Wind power — no inherent reversal risk; no reversal events r
0% deduction with 'deemed negligible' justification — approp
Jurisdictional method (good) but reassessment timing not sta
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated — dual-channel risk un
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →