Skip to main content
UCRChamba Himachal Pradesh IndiaAMS-I.D

2.4 MW Small Scale Hydro Power project by Shakti Hydro Electric Power Ltd, Chamba, Himachal Pradesh

UCR-55 ↗

#456of 770 in Renewable energy#1of 6 in Chamba Himachal Pradesh India#18of 421 in Universal Carbon Registry (UCR)#168of 417 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 2.4 MW small hydro project in Himachal Pradesh, India, registered under the UCR standard using the well-established AMS-I.D methodology. The project design is sound — jurisdictional baseline, FPIC conducted, no material findings — but the available record consists solely of the PDD, with no verification report, monitoring report, or verified emissions-reduction figures, leaving the actual performance and additionality verification unconfirmed.

Red Flags

  • No verification report or VVB report found in the available record; additionality was not confirmed by an independent verifier in the extracted data
  • No verified or claimed ERR figures available, making it impossible to assess whether the project delivered on its ex-ante estimates
  • Only a single document (the PDD) is available; no monitoring report covers the full 2014–2021 crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not found in available record

Permanence

Hydro project; no inherent reversal risk; no reversal events

Leakage

0% deduction deemed negligible; reasonable for grid-displace

Baseline

Jurisdictional baseline (good) but grid EF from 2014; no rea

Safeguards

FPIC conducted, safeguards and benefit sharing mentioned; gr

Double-claim

CORSIA eligibility and CCP status not stated in available re

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.