8.6 MW Windmill Power Project of Bellary Iron Ores Private Limited by Energy Advisory Services
#4of 17 in Karnataka India#64of 421 in Universal Carbon Registry (UCR)#202of 417 in AMS-I.D
Audit Analysis
An 8.6 MW wind power project in Karnataka registered under UCR with a jurisdictional baseline and no material findings, but the available record consists solely of a PDD with no verification report, monitoring data, or identified verification body. The claimed lifetime ERR of 650,892 tCO2 appears high relative to the stated capacity, and critical additionality and permanence details are absent from the extracted record.
Red Flags
- Claimed lifetime ERR of 650,892 tCO2 implies an approximately 80% capacity factor over 12 years, which is far above the typical 25–35% range for Indian wind turbines and raises over-crediting concerns
- No verification body, additionality test type, or verified ERR figure is present in the available record, making independent validation impossible
- Only a single PDD document is available; no verification report, monitoring report, or VVB identification exists in the extracted data
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB verification not stated in available recor
No buffer pool or reversal data; wind has low reversal risk
0% deduction deemed negligible — appropriate for grid-connec
Jurisdictional method is sound, but reassessment timing not
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →