Skip to main content
UCRMandi Himachal PradeshAMS-I.D

4 MW Small Scale Hydro Power project by M/S USP Hydro Energy Pvt. Ltd. in Himachal Pradesh

UCR-79 ↗

#460of 770 in Renewable energy#22of 421 in Universal Carbon Registry (UCR)#170of 416 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 4 MW small hydro project in Himachal Pradesh registered under the UCR registry using the AMS-I.D methodology. The jurisdictional baseline and negligible-leakage treatment are appropriate for a hydro displacement project, but the available record consists solely of a PDD with no verification report, monitoring data, or identified VVB, leaving additionality and credit volume unverified.

Red Flags

  • No verification body (VVB) is identified in the available record, and no verification or monitoring reports are present
  • Additionality test type and VVB confirmation are not documented in the extracted record
  • No ERR figures (claimed or verified) are available, making over- or under-crediting impossible to assess
  • Buffer pool or permanence risk mitigation is not stated for a project whose credits depend on continued operation

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not documented in available r

Permanence

Avoidance-type hydro; no reversal events reported

Leakage

0% deduction, deemed negligible — appropriate for grid displ

Baseline

Jurisdictional baseline stated; reassessment timing not docu

Safeguards

FPIC conducted and safeguards mentioned; grievance mechanism

Double-claim

CORSIA and CCP eligibility both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents