2 MW Small Scale Hydro Power project by M/S Pinnacle Hydro Energy Pvt. Ltd, Himachal Pradesh

UCR-77 ↗

#454of 770 in Renewable energy#1of 7 in Kullu Himachal Pradesh India#16of 421 in Universal Carbon Registry (UCR)#166of 417 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 2 MW small-scale hydro project in Himachal Pradesh registered under the UCR standard, with a jurisdictional baseline and smart-meter monitoring. The project design is low-risk in principle, but the available record consists solely of a PDD with no verification or monitoring reports, no identified VVB, and no quantified emission reduction figures, leaving the core claims unverifiable.

Red Flags

  • No verification report, monitoring report, or VVB identification found in the extracted record — the project's additionality and actual performance are entirely unverified
  • Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unsupported
  • PDD is dated 2022-01-17, which post-dates the end of the crediting period (2021-12-31), raising questions about the project's registration timeline

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated

Permanence

Hydro generation — no inherent reversal risk

Leakage

0% deemed negligible — appropriate for hydro

Baseline

Jurisdictional method, reassessment timing not stated

Safeguards

FPIC and safeguards mentioned; grievance mechanism not state

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents