Wind Power Project By M/s RVL
#525of 770 in Renewable energy#13of 42 in Gujarat India#93of 421 in Universal Carbon Registry (UCR)#227of 417 in AMS-I.D
Audit Analysis
A small wind power project in Gujarat, India, using the well-established AMS-I.D methodology with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO₂/MWh. However, the evidence base is extremely thin — only a single PDD is available, with no verification report, no identified verification body, and no monitoring data to confirm the 7,450 tCO₂ lifetime claim. The project type inherently carries low permanence and leakage risk, but the absence of any additionality documentation is a significant integrity gap.
Red Flags
- No additionality test or VVB verification of additionality is documented in any available record
- No verification body (VVB) is identified in the extracted data
- No monitoring report or verified ERR figure is available to corroborate the 7,450 tCO₂ lifetime claim
- Only a single PDD document forms the entire evidence base; no verification or monitoring reports exist
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test documented
Wind avoidance – low reversal risk
0% deduction, justified as negligible
Jurisdictional but unverified by VVB
Mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →