Skip to main content
UCRKullu Himachal Pradesh IndiaAMS-I.D

10 MW Toss Small Hydro Electric Project in Kullu District of Himachal Pradesh, India

UCR-69 ↗

#6of 7 in Kullu Himachal Pradesh India#194of 421 in Universal Carbon Registry (UCR)#290of 417 in AMS-I.D

3.3/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

The 10 MW Toss Small Hydro project under UCR presents a jurisdictional baseline and confirmed FPIC, but the available record consists solely of a PDD submitted in January 2022 for a 2014–2021 crediting period, with no verification reports, monitoring data, or ERR figures. Additionality testing, buffer pool arrangements, and FNRB methodology are entirely absent from the extracted record, leaving critical integrity and transparency gaps that cannot be resolved from the documents provided.

Red Flags

  • PDD dated 2022-01-03 covers a crediting period that ended in December 2021, indicating the project documentation was submitted after the crediting period closed — no contemporaneous monitoring or verification evidence is available
  • No additionality test type or VVB verification is stated in any available document, leaving the additionality claim unverified
  • No ERR figures (claimed or verified) are present in the record, making it impossible to assess over- or under-crediting
  • No buffer pool percentage or permanence risk mitigation is documented for a project whose crediting period has already elapsed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB verification found in available

Permanence

No buffer pool stated; no reversal events recorded but perma

Leakage

0% deduction deemed negligible — reasonable for hydro but ju

Baseline

Jurisdictional method stated; no reassessment date or timing

Safeguards

FPIC conducted and safeguards mentioned in PDD

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents