4.5MW Mini Hydel Power Project at M/s Gokak Power and Energy Limited by Energy Advisory Services
#8of 17 in Karnataka India#215of 421 in Universal Carbon Registry (UCR)#304of 417 in AMS-I.D
Audit Analysis
A 4.5 MW mini-hydro project in Karnataka registered under the UCR standard using the AMS-I.D methodology, with a jurisdictional baseline and a 2016 grid emission factor of 0.9 tCO₂/MWh. The available evidence is limited to a single PDD document; no verification report, monitoring report, or VVB identification is present, making it impossible to confirm additionality, verify emissions reductions, or assess over-crediting risk. The project's inherent physical permanence as a hydro asset is a positive, but the absence of a buffer pool, confirmed additionality testing, and any verified performance data leaves significant evidence gaps.
Red Flags
- No verification report or monitoring report is available; only a PDD was extracted, leaving additionality, ERR verification, and MRV quality entirely unconfirmed
- No VVB is identified in the available documents, so the independence and quality of the verification process cannot be assessed
- Neither claimed nor verified emissions reductions are available, preventing any assessment of over- or under-delivery
- Additionality test type and VVB confirmation are not stated in the extracted record, creating a material gap in the additionality chain
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test not confirmed in available documents
Inherent hydro permanence but no buffer pool
0% deemed negligible; reasonable but thin justification
Jurisdictional method; no reassessment date recorded
Mentioned with benefit sharing; no FPIC or grievance mechani
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →