2.1 MW Small Scale Wind Power Project by M/S Ajay Cotspin Industries
#503of 770 in Renewable energy#5of 33 in Gujarat India.#61of 421 in Universal Carbon Registry (UCR)#200of 417 in AMS-I.D
Audit Analysis
A 2.1 MW wind power project in Gujarat, India registered under the UCR standard, with a jurisdictional baseline and a 20-year crediting period. The project's only available document is the PDD; no verification report, monitoring report, or VVB assessment was found, leaving additionality, permanence safeguards, and verified emissions reductions entirely unconfirmed. The leakage treatment (0%, deemed negligible) is reasonable for grid-displacing wind, but the absence of any third-party verification or additionality evidence is a material gap.
Red Flags
- No additionality test type or VVB verification is stated anywhere in the available PDD; the additionality assessment is entirely absent from the extracted record.
- No verification report, monitoring report, or VVB report was found — the project's only document is the PDD, so no verified ERR figure exists to confirm the 3,311 tCO₂e lifetime claim.
- No buffer pool percentage is stated, and no reversal events are reported (field is empty), leaving permanence risk unquantified for a 20-year crediting period.
- FPIC and grievance mechanism are not stated in the PDD despite safeguards being mentioned, leaving community engagement unverified.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found in PDD
No buffer pool stated; no reversal events reported but risk
0% deduction, deemed negligible — consistent with grid-displ
Jurisdictional baseline with 2021 grid EF; no reassessment d
Safeguards mentioned but FPIC and grievance mechanism not st
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →