1.6 MW Bundled Solar Power Project in Himachal Pradesh
#451of 770 in Renewable energy#1of 13 in Himachal Pradesh India#13of 421 in Universal Carbon Registry (UCR)#163of 417 in AMS-I.D
Audit Analysis
A small 1.6 MW grid-connected solar project under the UCR registry using the well-established AMS-I.D. methodology with a jurisdictional baseline. The project type inherently carries low permanence and leakage risk, and no material findings or corrective actions were reported. However, the available record consists solely of a PDD, with no verification report, monitoring report, or VVB confirmation, leaving additionality, ERR delivery, and registry eligibility unverified.
Red Flags
- No verification report or monitoring report is present in the available documentation; additionality confirmation by a VVB cannot be verified
- No ERR figures (claimed or verified) are available, making over- or under-crediting assessment impossible
- Grid emission factor of 0.9 tCO2/MWh is drawn from 2014 data while the crediting period runs 2020–2021, a six-year gap that may overstate or understate the true baseline
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in available recor
Grid-connected solar; no biogenic carbon store; low inherent
0% deduction deemed negligible; consistent with grid-fed sol
Jurisdictional method; grid EF from 2014 for a 2020–21 perio
FPIC conducted and safeguards mentioned; grievance mechanism
CORSIA eligibility and CCP status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →