Skip to main content
UCRHimachal Pradesh IndiaAMS-I.D

1.6 MW Bundled Solar Power Project in Himachal Pradesh

UCR-152 ↗

#451of 770 in Renewable energy#1of 13 in Himachal Pradesh India#13of 421 in Universal Carbon Registry (UCR)#163of 417 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A small 1.6 MW grid-connected solar project under the UCR registry using the well-established AMS-I.D. methodology with a jurisdictional baseline. The project type inherently carries low permanence and leakage risk, and no material findings or corrective actions were reported. However, the available record consists solely of a PDD, with no verification report, monitoring report, or VVB confirmation, leaving additionality, ERR delivery, and registry eligibility unverified.

Red Flags

  • No verification report or monitoring report is present in the available documentation; additionality confirmation by a VVB cannot be verified
  • No ERR figures (claimed or verified) are available, making over- or under-crediting assessment impossible
  • Grid emission factor of 0.9 tCO2/MWh is drawn from 2014 data while the crediting period runs 2020–2021, a six-year gap that may overstate or understate the true baseline
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available recor

Permanence

Grid-connected solar; no biogenic carbon store; low inherent

Leakage

0% deduction deemed negligible; consistent with grid-fed sol

Baseline

Jurisdictional method; grid EF from 2014 for a 2020–21 perio

Safeguards

FPIC conducted and safeguards mentioned; grievance mechanism

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents