3.2/ 10
Integrity
3.5
Transparency
2.0
Claim Safety
4.5
Documentation
2.5

Audit Analysis

A 5 MW small-scale hydro project under the UCR registry with a jurisdictional baseline and a grid emission factor of 0.9 tCO₂/MWh, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB documentation. Key integrity elements such as the additionality test type, buffer pool, and verified ERR figures are absent from the extracted data, making independent assessment of claim robustness difficult.

Red Flags

  • No verification body (VVB) is identified in the available record; additionality verification status is unknown
  • Only a single document (PDD) is available — no verification report, monitoring report, or VVB audit report was found
  • Both total ERR claimed and total ERR verified are absent, preventing any assessment of over- or under-delivery
  • Leakage deduction of 0% is justified only as 'deemed negligible' without a quantified analysis in the extracted record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

Hydro infrastructure; no reversal events reported

Leakage

0% deemed negligible; minimal justification

Baseline

Jurisdictional method; reassessment timing not stated

Safeguards

FPIC and benefit sharing confirmed; grievance mechanism not

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents